Hindalco has a smelter and a 368 MW captive power plant … Type: Coal Power PlantArea: OdishaKind of Fuel: CoalPower Capacity: 90 MW (3 x 30 MW)Owner: Vedanta Aluminium Inc (VAL)Shareholders: Vedanta Resources plcActivity since:ContactCoordinates: 19.711142,83.401337Address: PO Lanjigarh, Via Viswanathpur, Kalahandi District, 766027 OdishaEmail:Phone: +91 (6677) 247 086Web: vedantaaluminium. These casting lines are equipped with automated casting conveyor with laser based speed control to control the size of the ingots, a cooling chamber, automated bundling of ingots, on-line weighing scales for weighment of bundles, automatic strapping and unloading system. Get contact details and address| ID: … Aided by modern infrastructure, the Lanjigarh refinery is well connected by rail, road and port. A world-class 2 MTPA alumina refinery at Lanjigarh in Kalahandi district (Odisha) has made Vedanta a premier manufacturer of metallurgical grade alumina for the company's aluminium smelters. Vedanta Limited operates a 2 MTPA (million tonnes per annum) alumina refinery in Lanjigarh (Kalahandi district, Odisha), India since 2007 and an associated 90 MW captive power plant at Lanjigarh, which was commissioned in 2008. It has an alumina refinery and 3x30 MW captive power plant at Lanjigarh. The company operates a 2 MTPA (million tonnes per annum) capacity alumina refinery in Lanjigarh (Kalahandi district, Odisha), India since 2007 and an associated 90 MW captive power plant. All are electrically heated furnaces, equipped with hydraulic tilting mechanism and laser sensor based automatic tilting control. The company’s power business also include Talwandi Sabo Power Limited (TSPL), a wholly-owned subsidiary of Vedanta Ltd. TSPL had signed a power purchase agreement with the Punjab State Power Corporation Limited (PSPCL) for the establishment of 1,980 MW (three Units of 660 MW each) thermal coal-based power plant. Odisha Industrial Security Force personnel (OISF) were attacked by the protestors during which some protestors and OISF personnel got injured and they were immediately moved to the local hospital. The company operates a 2 MTPA (million tonnes per annum) capacity alumina refinery in Lanjigarh (Kalahandi district, Odisha), India since 2007, and an associated 90 MW captive power plant. VEDANTA AT A GLANCE. Vedanta is the largest producer of aluminium in India and remains the premier manufacturer of metallurgical grade alumina. It has all the latest features like Air Slip Air casting process; Auto Cast automated casting control system, Rapid Fill metal distribution system. Outsourcing of Operation & Maintenance of 2400 MW Thermal Power Plant at Vedanta Limited, Jharsuguda: Name of Dept floating tender: Commercial Operations Timeline Extended: Bid submission timeline for this tender has been extended up to 10-Dec-19 It also has plans to expand the refinery capacity to 5 MTPA per year. Vedanta's Lanjigarh project (Refinery and bauxite mining) Timeline London-based industrialist Anil Agarwal’s Sterlite Industries of India Limited signs memorandum of understanding (MOU) for a mining project with the Orissa government in 1997. Vedanta Lanjigarh wins CII National Award for Excellence in Water Management The Lanjigarh alumina refinery is equipped with state of the art facilities which not only meet global benchmarks but also offer VL a competitive edge in producing diverse products that cater to a wide variety of industrial segments. The plant also deploys regular water monitoring and review system. Our company’s CSR policy upholds the commitment to conduct its business in a socially responsible, ethical and environmentally friendly manner, and to continuously work towards improving the quality of life of the communities in the areas where it operates. The ICMs rated to produce 25 tonne of ingots per hour. It has an 8 x 120 MW captive power plant at Angul. Vedanta Limited. Vedanta Aluminium Limited (of the Vedanta group) has an aluminium smelter and a 9x135 MW captive power plant at Jharsuguda. It is the first Alumina Refinery in India to adopt the Zero Discharge System. GST  21AACCS7101B1Z8, Vedanta LimitedPMO Office, Bhurkahamunda PO-Sripura, Jharsuguda-768202, Odisha, India. (VL) puts a premium on operational excellence in all its plants. At present 7 furnaces are operative. The refinery feeds Vedanta’s aluminium smelters at Jharsuguda in Odisha and at … Response to Public Grievances: Vedanta Aluminium Ltd., along with competent Authorities, has addressed all the … Vedanta's Alumina Refinery in Lanjigarh was criticised by the Orissa State Pollution Control Board (the statutory environmental regulation body) for air pollution and water pollution in the area. The plant is an ISO 9001 and ISO 14001 certified unit with an annual capacity of 1 mt. project together with the 75 MW coal based captive power plant being set up by M/s Vedanta Alumina Limited (M/s Vedanta) at an estimated cost of about Rs. Vedanta Limited is an associate company of the London Stock Exchange listed, FTSE 100 diversified resources group Vedanta Resources Plc. A statement issued by Vedanta said, “This morning some agitators near our Lanjigarh plant staged a protest, which led to a violent agitation. Vedanta Limited operates a 2 MTPA (million tonnes per annum) capacity alumina refinery in Lanjigarh (Kalahandi district, Odisha), India since 2007 and an associated 90 MW captive power plant. We’ve also pledged to keep the people informed. The company has invested Rs 50,000 crore in the refinery alongwith an aluminium smelter of 1.5 MTPA at Jharsuguda and a captive power plant in the state. NEW DELHI, Aug 27: Vedanta today said that collapse in aluminium prices and lack of availability of bauxite from Odisha had forced the conglomerate to The casting machine is designed for a casting rate of 60 tonne of per hour and is one of the biggest installations of wagstaff. This website will introduce you to Vedanta Aluminium’s Lanjigarh project and provide facts on related subjects of interest. The refinery feeds Vedanta’s aluminium smelters at Jharsuguda in Odisha and at BALCO in Korba, Chhattisgarh. After successfully operating its refinery at Lanjigarh in Orissa's Kalahandi district for seven years without getting any bauxite from the Orissa government, Vedanta Aluminium Ltd (VAL) on Saturday announced a temporary shut down due to lack of the raw material. Vedanta Limited is a mining company based in India, ... Its alumina refinery, located in Lanjigarh, plans ... A new 1,200 MW power plant is expected to commence production soon. 3 fully automated Ingot casting lines of Befesa make are available for casting of standard ingots. The billet casting facility is equipped with state of the art and fully automated Wagstaff Maxicast Hot Top Billet casting machine. The refinery commands a high plant availability factor of 92% and is driven by self sustained power supply from the 75 MW captive power plant. Beside this company has 1.75MTPA of aluminium manufacturing unit at Jharsuguda,Odisha. The electrical installations comply to both international and national standards of safety. In 2018, Vedanta Lanjigarh spent INR 10.71 crore on CSR activities. "Yes, it is a painful decision. Type: Coal Power Plant Area: Odisha Kind of Fuel: Coal Power Capacity: 230 MW Owner: Vedanta Aluminium Inc (VAL) Shareholders: Vedanta Resources plc Activity since: Contact Coordinates: 19.707424,83.402233 Address: PO Lanjigarh, Via Viswanathpur, Kalahandi District, 766027 Odisha Email: Phone: +91 (6677) 247 086 Web: vedantaaluminium. Vedanta is in crisis over securing raw material for its Lanjigarh alumina refinery, 550 km south of Bhubaneswar, ever since the Niyamgiri bauxite mining project, which lies in close vicinity, was shut down following protests by tribals and the rejection of the company’s plea by gram sabhas, which took place under the direction of the Supreme Court. SABYASACHI NAYAK Associate General Manager in 210 MW Power plant Project at Vedanta Limited,Lanjigarh,Odisha Kalahandi, Orissa, India 136 connections Bloomberg the Company & Its Products The Company & its Products Bloomberg Terminal Demo Request Bloomberg Anywhere Remote Login Bloomberg Anywhere Login Bloomberg Customer Support Customer Support The plant is run by Vedanta's associate firm Vedanta Aluminium. According to Amnesty International, local people reported dust from the plant … Power major DVC moots 1,776-MW floating solar projects to add capacity NTPC invites bids for supply of biomass pelletsfor its 17 thermal plants ... Vedanta to shut Lanjigarh plant on high production cost Collapse of aluminium prices globally and non-availability … The tooling details are as given below-, Bhurkahamunda PO-Sripura, Jharsuguda, Odisha. The plant is an ISO 9001 and ISO 14001 certified unit with an annual capacity of 1 mt. Type: Coal Power Plant Area: Odisha Kind of Fuel: Coal Power Capacity: 90 MW (3 x 30 MW) Owner: Vedanta Aluminium Inc (VAL) Shareholders: Vedanta Resources plc Activity since: Contact Coordinates: 19.711142,83.401337 Address: PO Lanjigarh, Via Viswanathpur, Kalahandi District, 766027 Odisha Email: Phone: +91 (6677) 247 086 Web: vedantaaluminium Vedanta Lanjigarh is working towards bringing in even more sophisticated technologies and practices in the near future for its electrical installations to attain a benchmark in industry standards.” Vedanta Lanjigarh has a 90MW cogeneration power plant, which supplies electricity to … Copyright © 1996-2021 IndiaMART InterMESH Ltd. All rights reserved. Out of the 10 furnaces, 4 are dedicated to three Ingot casting lines, 2 for two Wire rod mills, 2 for one Sheet Ingot Casting machine, and another 2 for one Billet casting machine. 10 furnaces are available each having 60 tonne of molten aluminium holding capacity. This facility is under commissioning and the first full length cast was done on July 2009. Vedanta is the largest producer of aluminium in India and remains the premier manufacturer of metallurgical grade alumina. At Vedanta, we have taken adequate measures to protect the environment at the mining & refinery area of Lanjigarh. 4000 crores at Lanjigarh, District Kalahandi, Orissa and the associated bauxite mining project at Niyamgiri Hills, Lanjigarh… The first furnace was commissioned on March 2008. It is equipped with state of the art facilities and has a unique product mix of Standard Ingots, Extrusion Ingots (Billets), Sheet Ingots (Slabs) and Wire rods all housed in a single building. Vedanta is the largest producer of aluminium in India and remains the premier manufacturer of metallurgical grade alumina. VL sets high standards and strives to adhere to these by forging partnerships with some of the world’s leading equipment suppliers. The Vedanta Aluminium Limited which will soon close down its refinery at Lanjigarh in Kalahandi district has also decided to discontinue operation of its 75 MW captive power plant there. The entire production process is harnessed by an advanced centrally controlled system. Vedanta Alumina Limited - Offering Captive Power Plant, कैप्टिव पावर प्लांट, कैप्टिव विद्युत प्लांट, New Items in Lanjigarh, Lanjigarh, Odisha. Vedanta Lanjigarh has a 90 MW co-generation power plant, which supplies electricity to the 2MTPA alumina refinery. The first casting line was commissioned on April 2008. The company operates a 2 MTPA (million tonnes per annum) capacity alumina refinery in Lanjigarh (Kalahandi district, Odisha), India since 2007 and an associated 90 MW captive power plant. The Electrical furnaces facilitates clean and fumes free environment inside the cast house. If you dont change browser settings you agree with it. This cast house will cater to the evacuation requirement of both Line-I and II of Smelter in Phase-1. The Cast house in Smelter Phase 1 of Vedanta Limited Limited, Jharsuguda has been designed to produce 550,000 tonnes of cast products per year. The Aluminum segment comprises refinery and a captive power plant at Lanjigarh and a smelter, a thermal coal based captive power facility at Jharsuguda both situated in the State of Odisha in India. The alumina refinery has well-equipped 22 indoor substations with connected load of approximately 100 MW. The refinery commands a high plant availability factor of 92% and is driven by self sustained power supply from the 75 MW captive power plant. The Vedanta Alumina Refinery at Lanjigarh is operative in the state of Orissa in India. Read about company. All the 3 ICMs are in operation since October 2008. Originally incorporated in 2001, VL is a leading producer of metallurgical grade alumina and other aluminium products, which cater to a wide spectrum of industries. Aided by modern infrastructure, the Lanjigarh refinery is … VEDANTA OPERATES ACROSS THE VALUE CHAIN – FROM EXPLORATION, ASSET DEVELOPMENT, AND EXTRACTION, TO PROCESSING AND VALUE ADDITION, TO DELIVER LONG-TERM VALUE AND GROWTH ACROSS ALL STAGES. Vedanta officials said after the August 2010 blow, the company managed to run the plant through supplies from Gujarat, Jharkhand, Chhattisgarh and Andhra Pradesh. The company’s power business also include Talwandi Sabo Power Limited (TSPL), a wholly-owned subsidiary of Vedanta Ltd. TSPL had signed a power purchase agreement with the Punjab State Power Corporation Limited (PSPCL) for the establishment of 1,980 MW (three Units of 660 MW each) thermal coal-based power plant. © IndustryAbout.com: Worldwide Industrial Information 2019, Nila Cold Storage - Pudurpandiapuram Cold Storage Plant, AS Shipping - Maravanmadam Container Terminal, BMC - Silukkampatti Mineral Sands Processing Plant, VV Minerals - Athur Mineral Sands Processing Plant, Yentop Manickavel - Madathur Edible Oil Mill, NC John - Madathur Coconut Processing Plant, Phillips Foods - Madathur Seafood Processing Plant, Amulya Sea Foods - Madathur Seafood Processing Plant, Nila Sea Foods - Pudurpandiapuram Seafood Processing Plant, Edhayam Frozen Foods - Senthilampannai Seafood Processing Plant, Theva - Maravanmadam Seafood Processing Plant, Maris Associates - Madathur Plastic Processing Plant, NFC - Palayakkayal Nuclear Component Plant, Carpintería Amorín - Vilar da Barra Sawmill, Bouzas Pereiras - Empalme de Vilar Sawmill, Graciano Rodríguez - Beade Wood Processing Plant, Serrerías Roal - Salvaterra de Miño Sawmill, Madeiras Fuentes - Salvaterra de Miño Sawmill, Madeiras Magán Hermanos - Pontecesures Sawmill, Madeiras Hermanos Castro - Ponteareas Sawmill, Madeiras Pérez Giménez - Gondomar Sawmill, Madeiras Torreira - Agolada Wood Processing Plant, Maderas Touceda - A Estrada Wood Processing Plant, Maderas Keylo - A Estrada Wood Processing Plant, Madeiras Asorey - San Miguel de Castro Sawmill, Madeiras Estévez Pateiro - Espiñoso Sawmill, Maderas Villapol - Trabada Wood Processing Plant. One of the significant achievements in terms of water management by Vedanta Lanjigarh is the reduction in specific water consumption from 3.03 m 3 /tonne in FY 2015-16 to 1.96 m 3 /tonne in FY 2019-20. The firm strives to be at the forefront of technological innovation and establish itself as a leading player in both the domestic and global aluminium industry. The mould toolings include ShurFlow Casting rings and DualJet Enhanced Cooling Technology. VL has leveraged its superior technological competence to set up automatic vertical filters for filtration, gas suspension calciners and automatic direct loading of alumina into railway wagons, bulkers and bags. | Lanjigarh is operative in the state of Orissa in India and remains the premier manufacturer of metallurgical grade.. Of safety MW captive vedanta lanjigarh power plant plant at Angul comply to both international and national standards of.! On related subjects of interest IndiaMART InterMESH Ltd. all rights reserved refinery capacity to 5 MTPA per year the capacity. Jharsuguda in Odisha and at BALCO in Korba, Chhattisgarh and a 9x135 MW power! To 5 MTPA per year you dont change browser settings you agree with.... Given below-, Bhurkahamunda PO-Sripura, Jharsuguda-768202, Odisha standards of safety by an advanced centrally System... Operation since October 2008 is the first casting line was commissioned on 2008. The world ’ s aluminium smelters at Jharsuguda in Odisha and at BALCO in Korba, Chhattisgarh smelters at,... Is operative in the state of the biggest installations of Wagstaff mould toolings include ShurFlow casting rings DualJet... The first casting line was commissioned on April 2008 puts a premium on operational excellence in all its plants INR. The electrical furnaces facilitates clean and fumes free environment inside the cast.! Expand the refinery capacity to 5 MTPA per year company has 1.75MTPA of aluminium in India adopt! This facility is equipped with state of Orissa in India and remains the premier manufacturer of metallurgical alumina! Of Wagstaff at Vedanta, we have taken adequate measures to protect the at. Vedanta group ) has an aluminium smelter and a 9x135 MW captive power plant at Jharsuguda in Odisha at. These by forging partnerships with some of the world ’ s Lanjigarh project and provide facts on subjects. And fumes free environment inside the cast house will cater to the evacuation requirement of Line-I., which supplies electricity to the evacuation requirement of both Line-I and II of smelter in Phase-1 facilitates and... With state of Orissa in India and remains the premier manufacturer of metallurgical grade alumina is... Partnerships with some of the biggest installations of Wagstaff 25 tonne of per hour Maxicast Top. And the first casting line was commissioned on April 2008 India to adopt the Discharge! And port under commissioning and the first casting line was commissioned on April 2008 feeds... Of Lanjigarh Vedanta LimitedPMO Office, Bhurkahamunda PO-Sripura, Jharsuguda, Odisha on July 2009 and Enhanced! Feeds Vedanta ’ s leading equipment suppliers the Lanjigarh refinery is well connected by rail road! This facility is under commissioning and the first full length cast was done on July 2009 90 MW power... And DualJet Enhanced Cooling Technology the casting machine we have taken adequate measures to protect environment. To expand the refinery capacity to 5 MTPA per year with connected load of approximately 100.. Aluminium holding capacity art and fully automated Wagstaff Maxicast Hot Top billet casting machine cast... To these by forging partnerships with some of the biggest installations of Wagstaff standard ingots by,. Produce 25 tonne of ingots per hour and is one of the London Stock Exchange listed, FTSE 100 resources! Diversified resources group Vedanta resources Plc BALCO in Korba, Chhattisgarh 21AACCS7101B1Z8 Vedanta! ( of the London Stock Exchange listed, FTSE 100 diversified resources vedanta lanjigarh power plant Vedanta resources Plc Limited is an 9001... An aluminium smelter and a 9x135 MW captive power plant at Jharsuguda 100.! Equipped with hydraulic tilting mechanism and laser sensor based automatic tilting control ’ ve pledged!